Saint Clair County Full Unconditional Waiver of Lien Form
Last validated October 23, 2026 by our Forms Development TeamFormatted for recording in Saint Clair County, for property anywhere in the county: rural and unincorporated areas as well as Algonac, Allenton, Anchorville, Avoca, Capac, Casco, Columbus, East China and 14 more.
- 3 documents included
- Immediate PDF download
- Formatting guarantee

Saint Clair County Full Unconditional Waiver of Lien Form
Fill in the blank Full Unconditional Waiver of Lien form formatted to comply with all Michigan recording and content requirements.

Saint Clair County Full Unconditional Waiver of Lien Guide
Line by line guide explaining every blank on the Full Unconditional Waiver of Lien form.

Saint Clair County Completed Example of the Full Unconditional Waiver of Lien Document
Example of a properly completed Michigan Full Unconditional Waiver of Lien document for reference.
All 3 documents above included • One-time purchase • No recurring fees
Immediate Download • Secure Checkout
Additional Michigan and Saint Clair County documents included at no extra charge:
Where to Record Your Documents
St. Clair County Register of Deeds
Port Huron, Michigan 48060
Hours: 8:00 to 12:00 & 1:00 to 4:30 Mon-Thu; 10:30 to 12:00 & 1:00 to 4:30 on Fri
Phone: (810) 989-6930
Recording Tips for Saint Clair County:
- Bring your driver's license or state-issued photo ID
- Ensure all signatures are in blue or black ink
- Documents must be on 8.5 x 11 inch white paper
- Double-check legal descriptions match your existing deed
- Verify all names are spelled correctly before recording
Cities and Jurisdictions in Saint Clair County
Properties in any of these areas use Saint Clair County forms:
- Algonac
- Allenton
- Anchorville
- Avoca
- Capac
- Casco
- Columbus
- East China
- Emmett
- Fair Haven
- Fort Gratiot
- Goodells
- Harsens Island
- Jeddo
- Marine City
- Marysville
- Memphis
- North Street
- Port Huron
- Saint Clair
- Smiths Creek
- Yale
Hours, fees, requirements, and more for Saint Clair County
How do I get my forms?
Forms are available for immediate download after payment. The Saint Clair County forms will be in your account ready to download to your computer. An account is created for you during checkout if you don't have one. Forms are NOT emailed.
Are these forms guaranteed to be recordable in Saint Clair County?
Yes. Our form blanks are guaranteed to meet or exceed the applicable formatting requirements used for recording in Saint Clair County, including margin requirements, font requirements, and other layout standards. This guarantee applies to formatting, not to the legal sufficiency of information entered by the user or the suitability of a form for a particular transaction.
Can I reuse these forms?
Yes. You can reuse the forms for your personal use. For example, if you have multiple properties in Saint Clair County you only need to order once.
What do I need to use these forms?
The forms are PDFs that you fill out on your computer. The free Adobe Acrobat Reader is recommended, and most PDF apps also work. You do NOT enter your property information online - you download the blank forms and complete them privately on your own computer.
Are there any recurring fees?
No. This is a one-time purchase. Nothing to cancel, no memberships, no recurring fees.
How much does it cost to record in Saint Clair County?
Recording fees in Saint Clair County vary. Contact the recorder's office at (810) 989-6930 for current fees.
Questions answered? Let's get started!
Michigan's Construction Lien Act will not let a lien waiver run ahead of the money. A full unconditional waiver of lien is signed after full payment for the contract has actually arrived, and once signed it holds nothing back: no amount left open, no condition waiting on a check to clear. Section 115 of the Construction Lien Act, 1980 PA 497, MCL 570.1115, prints the wording, and a claimant paid in full provides the waiver to the owner, lessee, or designee.
Payment first, then the waiver
MCL 570.1115(1) is where Michigan draws the line. A person may not require, as part of any contract for an improvement, that the right to a construction lien be waived in advance of work performed, and a waiver obtained that way is contrary to public policy and invalid, except to the extent that payment for labor and material furnished was actually made to the person who gave it. The same subsection adds that accepting a promissory note or other evidence of indebtedness does not of itself waive or discharge lien rights. MCL 570.1115(2) then makes the document the claimant's answer to being paid: a lien claimant who receives full payment for the contract provides a full unconditional waiver of lien.
What the statutory words give up
The operative sentence names the contract, what was furnished, and the property improved, and then states that the contract has been fully paid and satisfied and that all of the claimant's construction lien rights against that property are waived and released. The partial waiver at MCL 570.1115(3) covers an amount received, and the conditional waivers in MCL 570.1115(4) take effect only upon payment of the amount indicated. This one carries no amount entry and no condition. Its counterweight sits in MCL 570.1115(6): a waiver under section 115 becomes effective when a person makes payment relying on it, unless that person has written notice, at the time of payment, that the consideration for the waiver has failed.
The paragraph that makes a homeowner pick up the phone
On residential work the statutory form carries its own authenticity paragraph, and it prints on this form. Where the improvement is to a residential structure, where the claimant filed a notice of furnishing or is excused from filing one, and where the waiver reaches the owner, lessee, or designee from someone other than the claimant named in it, MCL 570.1115(7) holds reliance until the recipient verifies the waiver with that claimant in writing, by telephone, or personally. That is why the claimant's name, address, and telephone number sit on the face of the document. MCL 570.1115(8) answers the parallel question for laborers, whose authorized agent may provide waivers on their behalf.
Where the document goes after it is signed
A Michigan construction lien waiver is not filed anywhere. The statutory form carries no notarial certificate and no witness line: the claimant signs it, dates it, and hands it to the owner, lessee, or designee, keeping a copy as the statutory caution line describes. The register of deeds sees a different instrument from the same job, the claim of lien under MCL 570.1111, recorded separately and not part of this package; the MCL 565.201 recording-format conditions govern that instrument rather than this delivered one. Whatever a pay application calls it, a lien release or lien waiver in Michigan travels by delivery.
The configuration this form carries
This is the full unconditional waiver of the four forms in MCL 570.1115(9), which the statute directs to be used in substantially the format printed there. One lien claimant is named on a free entry line, because contractors, subcontractors, suppliers, and laborers share one waiver wording under the act, and one signature block follows, with the printed name, date signed, title, address, and telephone entries the statutory form prints. County, street address, and legal description entries together supply the statutory description of the property improved. A subcontractor closing out a mechanical or electrical contract with the general contractor, and a supplier collecting the last invoice on a job, present the paid-in-full pattern this waiver recites. Nothing on the form states an amount or a condition, so the document expresses one thing: a contract paid in full, with the lien rights that secured it released.
The package includes the fillable waiver form, a completed example filled in for an Oakland County mechanical subcontract, and a guide covering section 115, each entry on the form, signing, and delivery. These materials are informational and do not constitute legal advice.
Important: Your property must be located in Saint Clair County to use these forms. Documents should be recorded at the county recording office listed above.
This Full Unconditional Waiver of Lien meets all recording requirements specific to Saint Clair County.
Our Promise
The documents you receive here are guaranteed to meet or exceed the applicable Saint Clair County recording format requirements. If there is a rejection caused by our formatting, we will correct the issue or refund your payment. This guarantee applies to document formatting only and does not extend to information entered by the user, the selection of the form, or the legal effect of the completed document.
Save Time and Money
Get your Saint Clair County Full Unconditional Waiver of Lien form done right the first time with Deeds.com Uniform Conveyancing Blanks. At Deeds.com, we understand that your time and money are valuable resources, and we don't want you to face a penalty fee or rejection imposed by a county recorder for submitting nonstandard documents. We constantly review and update our forms to meet rapidly changing state and county recording requirements for roughly 3,500 counties and local jurisdictions.
4.8 out of 5 - ( 4,836 Reviews )
Monica S. 5 out of 5 stars
Great forms, thank you so much.
Thank you for your feedback. We really appreciate it. Have a great day!
Robin F. 5 out of 5 stars
Very Convenient and easy to use
We appreciate your business and value your feedback. Thank you. Have a wonderful day!
PAUL L. 5 out of 5 stars
Outstanding site in every way and reasonably priced.
We appreciate your business and value your feedback. Thank you. Have a wonderful day!
Mary Lou Z. 5 out of 5 stars
I was able to download the TOD deed form with no issues and it showed immediately. I appreciate that there is a sample provided on how to complete the form. Once downloaded this form is yours and can be changed ,if you make an error. This form is not complicated and is recognized by the County Court House where I filed the document. I am very pleased this form is available to process on my own and the fee is very reasonable. TY.
Thank you, Mary Lou. We are glad the transfer on death deed downloaded smoothly and that the completed sample made the process clear. It is great to hear your county recorded it without any trouble. We built these forms so property owners can handle the filing themselves with confidence, and at a fair one-time price. Thank you for choosing Deeds.com.
Kathryn C. 2 out of 5 stars
The transfer deed documents are laid out the way county offices need, but I don't like the requirements so I'm going to leave a bad review.
Well, thanks we guess.
Kate J. 5 out of 5 stars
Easy to use.
Thank you!
David P. 5 out of 5 stars
Easy to use and very straight forward. Glad I used Deeds.com
We appreciate your business and value your feedback. Thank you. Have a wonderful day!
Turto T. 5 out of 5 stars
The documents were accurate and event well packaged. They contained all the information that was needed to establish revocable trusts and transfer the property into the trusts. All of this with decent price.
Thank you for your feedback. We really appreciate it. Have a great day!
Nancy S. 5 out of 5 stars
Outstanding forms, thanks for making this easy.
Thank you!
Russell F. 5 out of 5 stars
Thanks for the prompt response to my inquiry. I appreciate the extra effort provided by Tom and Melbra. Great job!
Thank you!
Robert S. 4 out of 5 stars
Process was easy to follow and worked as advertised. Thought the price was a little high.
Thank you!
DONNA P. 5 out of 5 stars
Deeds.com was quick, efficient, and cost effective. Deeds.com works with individuals where I found other companies only offer services to title companies, settlement companies, etc. Thank you Deeds.com!
Thank you for your feedback. We really appreciate it. Have a great day!
Sandra M. 5 out of 5 stars
The forms were easy to use but there was a software issue that made it impossible to get the county name to appear on the form in the correct place. It made the deed look a little sloppy
Thank you!
Don R. 3 out of 5 stars
From Pennsylvania here. Documents are great and easy to fill out however you are lacking a couple of things. You only provide the option for a Grant Deed when you purchase by your county which is Mercer County for me. Why not give the ability to get a Warranty Deed that better protects the Grantee? Also, being from Pennsylvania and in a county that mined Buituminous Coal we are required to include the Coal Severance Notice and Bituminous Mine Subsidence and Land Conservation Act Notice. You can check the box on your Deed form that they are required and attached but you do not provide the verbiage or form for this. You state that you know what each county requires and include everything required but you do not include these two required Notices. This has been a requirement for years and the wording never changes. I had to look for these Notices and hand type this information and include it on another seperate page after the Notary section on the Deed. The Grantor has to sign the Coal Severance Notice and be witnessed by a Notary so I had to add another place for the Notary and will have to pay twice for witnessed signatures when it could have been included in your document. My Deed from 2003 was done that way and then the Notary statement after that so it was only one notarized witness of signature.
Thank you for your feedback. We really appreciate it. Have a great day!
Rick W. 1 out of 5 stars
Hi, I must have done something wrong. I need a QuitClaim North Carolina Dare County form. I don't need the Warranty Claim that appeared in my download list. Can I exchange forms?
As a one time courtesy we have canceled the order and payment you made for the warranty deed in error. Have a wonderful day.