Hampton City Sub-subcontractor Memorandum for Mechanics Lien Form

Last validated June 16, 2026 by our Forms Development Team

Hampton City Sub-subcontractor Memorandum for Mechanics Lien Form

Hampton City Sub-subcontractor Memorandum for Mechanics Lien Form

Fill in the blank Sub-subcontractor Memorandum for Mechanics Lien form formatted to comply with all Virginia recording and content requirements.

Document Last Validated 6/1/2026
Hampton City Memorandum for Mechanics Lien Guide

Hampton City Memorandum for Mechanics Lien Guide

Line by line guide explaining every blank on the form.

Document Last Validated 6/16/2026
Hampton City Completed Example of the Memorandum for Mechanics Lien Document

Hampton City Completed Example of the Memorandum for Mechanics Lien Document

Example of a properly completed form for reference.

Document Last Validated 4/24/2026

All 3 documents above included • One-time purchase • No recurring fees

Immediate Download • Secure Checkout

Important: Your property must be located in Hampton City to use these forms. Documents should be recorded at the office below.

Where to Record Your Documents

Hampton City Circuit Court Clerk

Address:
237 N King St / PO Box 40
Hampton , Virginia 23669-0040

Hours: 8:30 to 4:00 Monday through Friday

Phone: (757) 727-6187

Recording Tips for Hampton City:
  • Bring your driver's license or state-issued photo ID
  • Double-check legal descriptions match your existing deed
  • Check margin requirements - usually 1-2 inches at top
  • Multi-page documents may require additional fees per page

Cities and Jurisdictions in Hampton City

Properties in any of these areas use Hampton City forms:

  • Fort Monroe
  • Hampton

View Complete Recorder Office Guide

Hours, fees, requirements, and more for Hampton City

How do I get my forms?

Forms are available for immediate download after payment. The Hampton City forms will be in your account ready to download to your computer. An account is created for you during checkout if you don't have one. Forms are NOT emailed.

Are these forms guaranteed to be recordable in Hampton City?

Yes. Our form blanks are guaranteed to meet or exceed the applicable formatting requirements used for recording in Hampton City, including margin requirements, font requirements, and other layout standards. This guarantee applies to formatting, not to the legal sufficiency of information entered by the user or the suitability of a form for a particular transaction.

Can I reuse these forms?

Yes. You can reuse the forms for your personal use. For example, if you have multiple properties in Hampton City you only need to order once.

What do I need to use these forms?

The forms are PDFs that you fill out on your computer. You'll need Adobe Reader (free software that most computers already have). You do NOT enter your property information online - you download the blank forms and complete them privately on your own computer.

Are there any recurring fees?

No. This is a one-time purchase. Nothing to cancel, no memberships, no recurring fees.

How much does it cost to record in Hampton City?

Recording fees in Hampton City vary. Contact the recorder's office at (757) 727-6187 for current fees.

Questions answered? Let's get started!

Virginia Mechanic's Lien by a Sub-subcontractor

In Virginia, a lien claimant may make a claim for a mechanic's lien by completing and recording a "Memorandum for Mechanic's Lien" document. There are separate versions of the Memorandum depending on whether the claimant is a contractor, subcontractor, or sub-subcontractor.

In general, a mechanic's lien claim is made when a property owner or other person in the chain has not paid the contractor or others owed payment. The lien works as a security device by placing an encumbrance on the property, which in turn prompts the property's owner to pay in order to remove the lien. Liens can also be sought against payment funds, for example, by preventing a contractor from being paid by the owner until the subcontractors are paid.

A general contractor must file a memorandum of lien at any time after the work is commenced or material furnished, but not later than 90 days from the last day of the month in which he last performs labor or furnishes material, and within 90 days from the time the work ends. Va. Code 43-4. The memorandum is then filed in the clerk's office in the county or city in which the property is located. Id.

The memorandum must show: (1) the name of the owner of the property, (2) the claimant of the lien, (3) the amount and consideration of the claim, (4) the time or times when the claim is or will be due and payable, (5) a verification by the oath of the claimant, or his agent, including a statement declaring his intention to claim the benefit of the lien, and (6) a brief description of the property. Id. Include the claimant's license or certificate number issued by the Board for Contractors, if any, and the date such license or certificate was issued as well as the date such license or certificate expires. Id.

Sub-subcontractors (and sub-sub-subcontractors and so on) may also claim a lien. The same provisions for general and subcontractors apply as far as timelines and what must be included in the claim. In addition, the sub-sub must give notice in writing to the owner of the property, or his agent, and to the general contractor, or his agent, of the amount and character of his claim. Va. Code 43-9. The lien amount must also not exceed the amount for which such subcontractor could himself claim a lien. Id.

In conclusion, a mechanic's lien is a powerful tool when used properly. By keeping track of key dates and parties in each construction job, contractors can protect their rights.

This article is provided for informational purposes only and should not be relied upon as a substitute for the advice of an attorney. Please contact an attorney with any questions about filing a Memorandum for a Mechanic's Lien in Virginia.

Important: Your property must be located in Hampton City to use these forms. Documents should be recorded at the office below.

This Sub-subcontractor Memorandum for Mechanics Lien meets all recording requirements specific to Hampton City.

Our Promise

The documents you receive here are guaranteed to meet or exceed the applicable Hampton City recording format requirements. If there is a rejection caused by our formatting, we will correct the issue or refund your payment. This guarantee applies to document formatting only and does not extend to information entered by the user, the selection of the form, or the legal effect of the completed document.

Save Time and Money

Get your Hampton City Sub-subcontractor Memorandum for Mechanics Lien form done right the first time with Deeds.com Uniform Conveyancing Blanks. At Deeds.com, we understand that your time and money are valuable resources, and we don't want you to face a penalty fee or rejection imposed by a county recorder for submitting nonstandard documents. We constantly review and update our forms to meet rapidly changing state and county recording requirements for roughly 3,500 counties and local jurisdictions.

4.8 out of 5 - ( 4748 Reviews )

Kerianne B.

June 25th, 2021

I would definitely recommend Deeds.com. It was so easy! I wish we knew about them a long time ago.

Reply from Staff

Thank you for your feedback. We really appreciate it. Have a great day!

Anthony P.

May 16th, 2025

I was able to easily navigate the interface and purchase the forms that I needed. I was then able to prepare the forms with assistance from the reference documents provided with the deed. This was simple, easy, and user friendly. Great job!

Reply from Staff

Thanks, Anthony! We're glad to hear the process was simple and user-friendly for you. Appreciate the great feedback!

Bethany F.

April 6th, 2022

quick and easy to use

Reply from Staff

Thank you!

Sylvia B.

October 21st, 2020

What a wonderful resource! Forms are so easy to use, made the process a breeze. Deeds even helped with the recording. Thank you.

Reply from Staff

We appreciate your business and value your feedback. Thank you. Have a wonderful day!

Linda P.

January 27th, 2022

Once I found this site the rest was easy. I read through the guide but the example really helped the most. Very easy!!!

Reply from Staff

We appreciate your business and value your feedback. Thank you. Have a wonderful day!

Emily P.

March 25th, 2020

Used the quitclaim form and the erecording service. Very smooth transaction, everything worked as it should.

Reply from Staff

Thank you for your feedback. We really appreciate it. Have a great day!

Tracey T.

July 19th, 2019

Lots of great information. Might need to view it again but found it very helpful!

Reply from Staff

Thank you!

Carol C.

October 20th, 2021

Thanks. So easy to navigate. Also very useful. I recommend.

Reply from Staff

We appreciate your business and value your feedback. Thank you. Have a wonderful day!

Norman K.

March 2nd, 2021

It wasn't really what I needed I read and read and read and read and I thought I was to do with for filing for probate or probate executor but instead it was for the property if you are executor and but it wasn't very clear on that so it didn't work for me so I was kind of wasted money

Reply from Staff

Sorry to hear that Norman. We've gone ahead and canceled your order and payment.

Sandra H.

April 1st, 2020

I did not receive the information in a timely fashion as stated on the website. I would not recommend this service.

Reply from Staff

Thank you for your feedback Sandra. In reviewing your order I see that it did take our staff 11 minutes to respond to your order. That is significantly longer than the 10 minute average listed on our website. Even in these unprecedented times of quarantines and staff shortages our failure is unacceptable. We have fully refunded your account and we do hope that you found something more suitable to your needs elsewhere.

Matilde A.

October 25th, 2021

Very easy to navigate... will be back to use!

Reply from Staff

Thank you for your feedback. We really appreciate it. Have a great day!

Shirley B.

July 9th, 2019

Very convenient, glad I discovered this website.

Reply from Staff

We appreciate your business and value your feedback. Thank you. Have a wonderful day!

stephanie h.

April 2nd, 2020

Very satisfied. In the middle of COVID19 I was able to complete important paperwork even though I wasn't completely sure what I was doing on my own. Quick and easy. Thank you. It means a lot to me.

Reply from Staff

Thank you for your feedback. We really appreciate it. Have a great day!

John N.

July 19th, 2020

Very easy to navigate.

Reply from Staff

Thank you!

Thomas D.

April 30th, 2020

The documents themselves are fine and the information provided with them is helpful. I find the actual processing of the documents, however, to be difficult particularly once the document has been saved. First, I note that the box for the date only allows entry of the last 2 digits of the year. Unfortunately, my download only allows me to enter one of the 2 digits required. When I delete it repeatedly, it eventually allows both digits to be entered but puts them in extremely small text and in superscrypt. I have not found a solution to this problem and am not sure the deed can even be recorded with this problem. Another problem is that if you try to revise the document after you have saved it the curser goes to the end of the line after each key entry. This means that there basically is no way to efficiently save the document for reworking later since you will have to delete everything you have entered in the text box unless you only need to make a single keystroke change or are willing to replace the curser after each entry. Try that with a long property description! Please note that I am using a Mac to prepare my documents and perhaps this is part of an "incompatibility problem". However, I didn't see a disclaimer regarding Mac use and so would expect the documents to perform correctly. Overall, I give the program a "2 star" rating because I am experiencing significant difficulties in entering dates in the documents even before saving them and because saving your work for later revision appears to be basically unworkable.

Reply from Staff

Thank you for your feedback Thomas, we appreciate you being specific about the issues you encountered. Adobe and Mac have a fairly long history of issues working together.