Hancock County Mechanics Lien Subcontractor Form

Last validated September 24, 2026 by our Forms Development Team

Formatted for recording in Hancock County, for property anywhere in the county: rural and unincorporated areas as well as Augusta, Basco, Bowen, Carthage, Colusa, Dallas City, Elvaston, Ferris and 8 more.

$3997
One-time purchase. No subscription.
  • 3 documents included
  • Immediate PDF download
  • Formatting guarantee

Hancock County Mechanics Lien Subcontractor Form

Hancock County Mechanics Lien Subcontractor Form

Fill in the blank Mechanics Lien Subcontractor form formatted to comply with all Illinois recording and content requirements.

Document last validated 9/18/2026
Hancock County Mechanics Lien Subcontractor Guide

Hancock County Mechanics Lien Subcontractor Guide

Line by line guide explaining every blank on the form.

Document last validated 9/10/2026
Hancock County Completed Example of the Mechanics Lien Subcontractor Document

Hancock County Completed Example of the Mechanics Lien Subcontractor Document

Example of a properly completed form for reference.

Document last validated 9/24/2026

All 3 documents above included • One-time purchase • No recurring fees

Immediate Download • Secure Checkout

Important: Your property must be located in Hancock County to use these forms. Documents should be recorded at the office below.

Where to Record Your Documents

Hancock County Clerk & Recorder

Address:
Courthouse - 500 Main St, Rm 7 / PO Box 39
Carthage, Illinois 62321

Hours: 8:00 to 4:00 Monday through Friday

Phone: (217) 357-3911

Recording Tips for Hancock County:
  • Bring your driver's license or state-issued photo ID
  • Ensure all signatures are in blue or black ink
  • Avoid the last business day of the month when possible
  • Both spouses typically need to sign if property is jointly owned
  • Bring extra funds - fees can vary by document type and page count

Cities and Jurisdictions in Hancock County

Properties in any of these areas use Hancock County forms:

  • Augusta
  • Basco
  • Bowen
  • Carthage
  • Colusa
  • Dallas City
  • Elvaston
  • Ferris
  • Hamilton
  • La Harpe
  • Nauvoo
  • Niota
  • Plymouth
  • Sutter
  • Warsaw
  • West Point

View Complete Recorder Office Guide

Hours, fees, requirements, and more for Hancock County

How do I get my forms?

Forms are available for immediate download after payment. The Hancock County forms will be in your account ready to download to your computer. An account is created for you during checkout if you don't have one. Forms are NOT emailed.

Are these forms guaranteed to be recordable in Hancock County?

Yes. Our form blanks are guaranteed to meet or exceed the applicable formatting requirements used for recording in Hancock County, including margin requirements, font requirements, and other layout standards. This guarantee applies to formatting, not to the legal sufficiency of information entered by the user or the suitability of a form for a particular transaction.

Can I reuse these forms?

Yes. You can reuse the forms for your personal use. For example, if you have multiple properties in Hancock County you only need to order once.

What do I need to use these forms?

The forms are PDFs that you fill out on your computer. The free Adobe Acrobat Reader is recommended, and most PDF apps also work. You do NOT enter your property information online - you download the blank forms and complete them privately on your own computer.

Are there any recurring fees?

No. This is a one-time purchase. Nothing to cancel, no memberships, no recurring fees.

How much does it cost to record in Hancock County?

Recording fees in Hancock County vary. Contact the recorder's office at (217) 357-3911 for current fees.

Questions answered? Let's get started!

Lien Claims by Subcontractor in Illinois

Mechanic's liens are available in Illinois pursuant to the Mechanic's Lien Act compiled under 770 ILCS 60. Liens are generally available for contractors, subcontractors, material or equipment suppliers, architects, and other design professionals. Subcontractors claiming a mechanic's lien should use the specialized form that references the contract between the property owner and the contractor (referred to as his or her agent in the lien claim document).

A lien is a type of property interest, like a mortgage. There are many types of liens such as tax liens, attorneys' liens, and judgment liens. A lien operates by allowing the lienor to make a claim against the property if it is later sold. Therefore, for a sale to occur, the property owner is required to disclose the existence of the lien to any potential purchaser and the sales proceeds must be used to pay off that lien. If the lien exceeds the value of the property this creates something known as a "deficiency," which must be recovered through a lawsuit. The lienor can also force a sale through foreclosure. Illinois only authorizes mechanic's liens on private projects and not those associated with public (government) entities.

When you provide labor or materials as a subcontractor to a general contractor and the general contractor never pays his or her invoice, filing a mechanic's lien is usually the next step in recovering the amount due. Subcontractors must also individually file 60-day (owner-occupied residential projects only) and 90-day notices to access their lien rights under State law. It is also helpful to attach these previous filed documents to the lien claim as exhibits to further support your case.

Mechanic's liens demand strict deadlines and missing the filing date by even one day can cost you your right to a lien. In Illinois, the time to file a lien arises within four (4) months from the last date of furnishing labor or delivered materials to the jobsite pursuant to the contract between the owner and his or her agent (contractor). The four-month period applies to your right against all third parties and subsequent owners. You have two (2) years to file suit against the original owner to foreclose on a mechanic's lien. 770 ILCS 60/9.

The claim for lien must state the parties to the contract and its terms, identify the general contractor and property owner, state a legal description of the owner's property, and state the total amount due and unpaid as of the date the notice is recorded. The lien amount includes the invoice amount owed minus all credits and offsets. A lienor may not include extras such as attorney's fees (unless a suit is filed to enforce the lien) or lost profits but may charge interest measured by the legal rate in Illinois. 770 ILCS 60/1(a).

Before recording the lien, sign it in the presence of a notary public who then notarizes it with his or her seal. The lien should be recorded at the recording office for the county where the property is situated. For residential projects, you must serve the owner with a copy of the recorded lien within ten (10) days' time.

The deadlines for filing a lien are set in stone, and failure to file on time will cost you your right to a lien. Additionally, putting in improper amounts or exaggerating the claim will invalidate the lien. If you lose your lien rights, the only remedy is to sue the property owner under contract law. As lawsuits are expensive, time-consuming, and stressful, this will become a much more challenging endeavor as opposed to enforcing a lien.

Each case is unique. Contact an attorney with specific questions regarding filing a subcontractor's claim or any other issues related to mechanic's liens in Illinois

Important: Your property must be located in Hancock County to use these forms. Documents should be recorded at the county recording office listed above.

This Mechanics Lien Subcontractor meets all recording requirements specific to Hancock County.

Our Promise

The documents you receive here are guaranteed to meet or exceed the applicable Hancock County recording format requirements. If there is a rejection caused by our formatting, we will correct the issue or refund your payment. This guarantee applies to document formatting only and does not extend to information entered by the user, the selection of the form, or the legal effect of the completed document.

Save Time and Money

Get your Hancock County Mechanics Lien Subcontractor form done right the first time with Deeds.com Uniform Conveyancing Blanks. At Deeds.com, we understand that your time and money are valuable resources, and we don't want you to face a penalty fee or rejection imposed by a county recorder for submitting nonstandard documents. We constantly review and update our forms to meet rapidly changing state and county recording requirements for roughly 3,500 counties and local jurisdictions.

4.8 out of 5 - ( 4,818 Reviews )

Camesha Y. 5 out of 5 stars

Was working with a notary client that need to do a deed. We got on this site, ordered the blank forms, he filled them out and we printed them so he could sign. Really clean forms, easy to understand and complete in a hurry. I will be letting all my clients know about this site.

Reply from Staff

That's terrific Camesha, glad to hear. Have a great day!

Robert C. 5 out of 5 stars

Amazingly easy process and excellent response time - very impressed!

Reply from Staff

Thank you!

Bob B. 5 out of 5 stars

Good so far. Will be great if you get the deed recorded.

Reply from Staff

Thank you!

Faith D. 5 out of 5 stars

That was really nice to use! Just don't have a computer but will go get copies. Thank you for being there.

Reply from Staff

Thank you!

Geneen C. 5 out of 5 stars

Love this site. The form directions are easy and I finished in less than an hour! Totally recommend it.

Reply from Staff

Thank you for your feedback. We really appreciate it. Have a great day!

Allen M. 5 out of 5 stars

Fast,quick and easy to work with. Not confusing.

Reply from Staff

We appreciate your business and value your feedback. Thank you. Have a wonderful day!

Cathern S. 5 out of 5 stars

Thanks much for your good help. Was a pleasure to use your help and was simple to use. Thanks much.

Reply from Staff

Thank you!

oscar r. 5 out of 5 stars

VERY MUCH HELPFUL SAVED ME 600 on not having to hire attorney

Reply from Staff

Thank you!

Donna J. 5 out of 5 stars

what do you do with it once filled out. doesn't tell you

Reply from Staff

Generally, once the documents are completed and executed they are recorded with the recorder where the property is located.

Darrell W. 5 out of 5 stars

Fast and easy to use. Nice to have available online.

Reply from Staff

Thank you for your feedback. We really appreciate it. Have a great day!

Marvin G. 5 out of 5 stars

I found exactly the perfect forms that I needed with Deeds, and much more. I definitely will be using Deeds com from this day going forward.

Reply from Staff

We appreciate your comments and your trust in us. Thank you.

Michael L. 5 out of 5 stars

Quick and Easy. Much appreciated!

Reply from Staff

Thank you for your feedback. We really appreciate it. Have a great day!

Michael W. 5 out of 5 stars

Appreciate the help with DC's non-intuitive forms. Superb service.

Reply from Staff

Thank you!

Thomas D. 2 out of 5 stars

The documents themselves are fine and the information provided with them is helpful. I find the actual processing of the documents, however, to be difficult particularly once the document has been saved. First, I note that the box for the date only allows entry of the last 2 digits of the year. Unfortunately, my download only allows me to enter one of the 2 digits required. When I delete it repeatedly, it eventually allows both digits to be entered but puts them in extremely small text and in superscrypt. I have not found a solution to this problem and am not sure the deed can even be recorded with this problem. Another problem is that if you try to revise the document after you have saved it the curser goes to the end of the line after each key entry. This means that there basically is no way to efficiently save the document for reworking later since you will have to delete everything you have entered in the text box unless you only need to make a single keystroke change or are willing to replace the curser after each entry. Try that with a long property description! Please note that I am using a Mac to prepare my documents and perhaps this is part of an "incompatibility problem". However, I didn't see a disclaimer regarding Mac use and so would expect the documents to perform correctly. Overall, I give the program a "2 star" rating because I am experiencing significant difficulties in entering dates in the documents even before saving them and because saving your work for later revision appears to be basically unworkable.

Reply from Staff

Thank you for your feedback Thomas, we appreciate you being specific about the issues you encountered. Adobe and Mac have a fairly long history of issues working together.

Mary Ann G. 2 out of 5 stars

Couldn't find the deed form that I needed. Needs to have a short summary to determine the correct form.

Reply from Staff

Sorry to hear that Mary Ann, we appreciate your feedback.